Calculators

Pro painting calculators

Sprayer usage, tip sizes, production rates, drying windows and the maths of a bid.

A painting bid is production rates times hours times a rate, plus materials, plus the overhead and profit that keep the business alive. The rates are the part most people guess. The production rate calculator here uses published figures by task and method as a starting point, and every pro should replace them with their own timed jobs, which is why they are inputs rather than constants.

The sprayer calculators do the arithmetic from the tip chart: fan width and orifice from the tip number, flow at pressure, and the overspray that an airless rig puts into the air rather than onto the wall. The drying calculator turns data-sheet times at 77 °F and 50% humidity into something closer to the day you are actually working.

7 calculators

Guides for this topic

Questions people ask

What spray tip size for latex walls?
A 515 or 517 is the usual choice: a 10 in fan with a 0.015 or 0.017 in orifice, which most 0.5 gallon-per-minute pumps support at full pressure. Trim and doors take a 310 to 412; thick elastomeric or block filler needs a 0.021 to 0.031 in orifice and a larger pump. The spray tip calculator maps material and fan width to a tip number and checks it against the pump.
How much extra paint does spraying use?
Airless overspray is typically 20 to 25% on interior walls, 30 to 40% outside in any wind, and 40% or more on fine-finish settings and on open railings. Rolling loses about 5% in the roller and tray. The spray versus roll calculator puts the two side by side in gallons and dollars.
How many hours does a room take a pro?
Walls of a 12 × 12 room, two coats rolled with cutting in, run about 3 to 4 hours of labour for an experienced painter; add the ceiling, trim and doors and a full room is most of a day. Prep can double it. The production rate calculator builds the total from each task.
What is the difference between markup and margin?
Markup is profit as a share of cost; margin is profit as a share of price. A 25% markup on a $1,000 cost gives a $1,250 price and a 20% margin. Bids priced "at 20% margin" and "at 20% markup" differ by about 5% of the total, which is often the whole profit.
How long between coats when it is humid?
Data-sheet recoat times assume about 77 °F and 50% relative humidity. At 85% humidity or below 50 °F, latex recoat times of 2 to 4 hours can stretch to 6 or more, and alkyds should wait overnight. The drying and recoat calculator applies those adjustments; the data sheet for your product is still the final word.

More calculators on our other sites

  • Floorings Calculator

    How much tile, wood, vinyl, carpet, underlayment and trim a floor needs, and what it costs.

  • Roofings Calculator

    Shingles, pitch, rafters, metal panels, gutters, ventilation and what a new roof costs.

  • The Woven Garden

    Garden and yard calculators for mulch, soil, gravel, sod, pavers, fences and decks.